yeah, looking forward to getting out. Getting close. Floor is done.
Had to rip out some more drywall. When the living room was done some 20 years ago they put a drywall nail through a water pipe. It did not leak much till recently, then when I pulled the baseboards off so the flooring could go in the nail come out followed by a bunch of water. That part of the sub floor has now been replaced, pipe fixed, but still need to do some blocking and patch a large hole in the living room wall. That was not in the project plan but I am gaining confidence in sweating pipes, blocking, laying down plywood and fixing drywall.